Maintenance multitechnique des bâtiments au profit de la DGA EP et petits travaux de réparation et aménagement (SOS Dépannage)
SID IDF
Essonne
02 Nov 2026
23 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- A single supplier will be selected. All or nothing.
- The contract is split into 2 lots, and one candidate may win at most 6. You may bid on the one that fits you only.
- Duration: 84 months (7 ans).
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
valentin.simonet@intradef.gouv.fr +33139213109
How many rivals you actually face
on "Maintenance" contracts, the median is 2 bids per lot; 75% of lots get three or fewer, and only 0% get more than ten.
43% of bids come from SMEs, and in 30% of lots no SME bid at all.
Measured on 96 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-91272.