Mission de maîtrise d'œuvre relative à la restructuration et l'extension des espaces de restauration du LPO de DEMBENI
RECT- 976
Mayotte
30 Oct 2026
25 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 30 October 2026, in 35 days.
- A single lot: the contract is taken whole or not at all.
- Quality carries 70% of the score. Cutting your price will not win this one; the technical proposal decides it.
- Duration: 6 months.
The notice does not state : the question deadline, the estimated value. These are in the consultation rules inside the tender file.
nadoum.aboubacar-ben-ali@ac-mayotte.fr 0269616186
How this buyer will score
Quality carries 70% of the score. Cutting your price will not win this one; the technical proposal decides it.
- 30% Prix
- 40% Pertinence des moyens humains mis à disposition pour l’exécution de la…prestation et Pertinence de l’organisation proposée par le candidat pour garantir le bon déroulement de l’opération
- 20% Pertinence et cohérence de la planification proposée pour respecter les délais…contractuels et capacité du candidat à réduire les délais de façon cohérente et réaliste.
- 10% Qualité environnementale du projet et Qualité de l’espace de travail…collaboratif proposé
How many rivals you actually face
on "Maîtrise d'oeuvre" contracts, the median is 6 bids per lot; 32% of lots get three or fewer, and only 34% get more than ten.
92% of the bids come from SMEs.
Measured on 88 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-92053.