Réalisation d’études, la conception, la fabrication, la fourniture, l’installation, la mise en service et la formation associée à un ensemble d’équipements modulaires.
UNIVERSITE DE CAEN NORMANDIE
Calvados
26 Oct 2026
26 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 26 October 2026, in 29 days.
- A single supplier will be selected. All or nothing.
- A single lot: the contract is taken whole or not at all.
- Duration: 3 months.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
marches.publics@unicaen.fr 0231565196
How many rivals you actually face
on "Equipements spécialisés" contracts, the median is 2 bids per lot, and 34% of lots receive a single one. Renouncing here is renouncing a contract nobody else wants.
88% of the bids come from SMEs.
Measured on 35 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-92439.