Diagnostic écologique et étude de conception de la revalorisation de la zone humide du réservoir de Boué-.
Commune de Boué
Aisne
30 Nov 2026
01 Oct 2026
Bid file for one lot: lot 1 lot 2
Technical proposal per lot (one draft per lot): Proposal for lot 1 Proposal for lot 2
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Order of magnitude of the trade across France (376 awarded contracts in this trade): a quarter under €153,543, median €317,865, three quarters under €740,267; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
- The clock: 10 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- Chambre d'agriculture de la somme won « Réalisation de sondages pédologiques pour intégration à l’étude visant à réviser la cartographie des zones hum » with Etablissement Lys Yser (Pas-de-Calais) : €61,940, 10 bids, 20/10/2026
- ARTELIA won « Prestations de missions écologiques pour la ville de saint herblain » with Mairie de St Herblain (Loire-Atlantique) : €1,000,000, 20/10/2026
- VERDI CONSEIL NORD DE FRANCE, ACTIERRA won « Expertise écologique couvrant l'ensemble du territoire de compétence de l'établissement et ce afin de répondre » with ETS PUBLIC FONCIER DE HAUTS DE FRANCE (Aisne) : 28/10/2026
- FLORES, ESPELIA won « Assistance à Maîtrise d'ouvrage pour des études de diagnostic, programmation et estimation financière » with Département de la Seine-Maritime (Seine-Maritime) : €800,000, 15 bids, 18/09/2026
- ABO-ERG GEOTECHNIQUE won « Accord-cadre pour la réalisation d'études géotechniques et diagnostics environnementaux sur le territoire comm » with Communauté d'agglomération ACCM (Bouches-du-Rhône) : €480,000, 10 bids, 15/09/2026
Across these 5 contracts: median amount €640,000 (4 published) ; median of 10 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 30 November 2026, in 10 days.
- The contract is split into 2 lots. You may bid on the one that fits you only.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
on "Maîtrise d'oeuvre" contracts, the median is 5 bids per lot; 38% of lots get three or fewer, and only 26% get more than ten.
77% of bids come from SMEs, and in 21% of lots no SME bid at all.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 84 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-94608.