Mission d'animation et de mise en oeuvre des Plans Nationaux d'Actions (PNA) en faveur de la biodiversité en Corse
DREAL Corse
Corse-du-Sud
04 Nov 2026
02 Oct 2026
To win this one
- The score: Quality carries 70% of the score. Cutting your price will not win this one; the technical proposal decides it.
- The price: Order of magnitude of the trade across France (355 awarded contracts in this trade): a quarter under €156,314, median €340,134, three quarters under €743,769; published amounts, often framework maxima.
- The stakes: Observed value: €340,134 (trade median, 355 contracts), 5 expected bids (trade median, 248 contracts); about €68,027 expected, an order of magnitude, not a quote.
- The clock: 9 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- PCM URBATEC won « Mission de maîtrise d'oeuvre - plan de mobilité de Maussane les Alpilles » with Commune (Bouches-du-Rhône) : €153,924, 01/10/2026
- DEKRA INDUSTRIAL won « Accord-cadre relatif aux missions de coordination en faveur de la sécurité et de la protection de la santé des » with LIMOGES METROPOLE - Communauté urbaine (Haute-Vienne) : €65,000, 7 bids, 09/10/2026
- IZHAK SAS won « Prestations de conseils, de conception et de mise en œuvre d’actions de communication pour le service Vélhop. » with Strasbourg Mobilités Vélo (Bas-Rhin) : €300,000, 11 bids, 14/10/2026
- ARMOR INGENIERIE, ADA ARCHITECTURE won « Mission de maîtrise d'oeuvre pour les travaux de mise en conformité désenfumage Bloc Hôpital » with 35 CHU (Ille-et-Vilaine) : €380,250, 22/10/2026
- EPODE won « Maitrise d’œuvre pour l’Extension du Parc d’Activités de PLAN CUMIN » with Communauté de Communes Coeur de Savoie (73) (Savoie) : €273,240, 03/09/2026
Across these 5 contracts: median amount €273,240 (5 published) ; median of 9 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 4 November 2026, in 9 days.
- Confirm the submission time or time zone on the buyer's platform.
- The contract is split into 6 lots, and one candidate may win at most 2. You may bid on the one that fits you only.
- Quality carries 70% of the score. Cutting your price will not win this one; the technical proposal decides it.
- Duration: 3 months, renewable.
- Estimated value: 375 000 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 11 January 2027.
The notice does not state : the question deadline. These are in the consultation rules inside the tender file.
How this buyer will score
Quality carries 70% of the score. Cutting your price will not win this one; the technical proposal decides it.
- 60% Pondération à 60%
- 30% Pondération à 30%
- 10% Pondération à 10%
How many rivals you actually face
on "Ingénierie" contracts, the median is 4 bids per lot; 31% of lots get three or fewer, and only 23% get more than ten.
59% of bids come from SMEs, and in 50% of lots no SME bid at all.
Stakes: Observed value: €340,134 (trade median, 355 contracts), 5 expected bids (trade median, 248 contracts); about €68,027 expected, an order of magnitude, not a quote.
Measured on 13 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-94802.