Désenfumage des circulations des étages du Pavillon Françon du Centre Hospitalier Métropole Savoie - site d'Aix-les-Bains
Ght Savoie Belley - Ch Métropole Savoie
Savoie
26 Nov 2026
12 Oct 2026
Bid file for one lot: lot 1 lot 2 lot 3 lot 4 lot 5 lot 6 lot 7 lot 8 lot 9
Technical proposal per lot (one draft per lot): Proposal for lot 1 Proposal for lot 2 Proposal for lot 3 Proposal for lot 4 Proposal for lot 5 Proposal for lot 6 Proposal for lot 7 Proposal for lot 8 Proposal for lot 9
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Observed value: €639,681 (trade median, 175 contracts), 3 expected bids (trade median, 120 contracts); about €213,227 expected, an order of magnitude, not a quote.
- The clock: 7 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- LES CONSTRUCTEURS DU ROCHER, DAUPHINE ISOLATION PROJECTION won « Reconstruction de l'internat du Centre Hospitalier de Béziers - Lots 02 à 20 » with SEM ARAC OCCITANIE (Hérault) : €2,150,000, 3 bids, 06/10/2026
Across these 1 contracts: median amount €2,150,000 (1 published) ; median of 3 bids (1 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 26 November 2026, in 7 days.
- The contract is split into 9 lots. You may bid on the one that fits you only.
- Duration: 24 months (2 ans).
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)), the estimated value. These are in the consultation rules inside the tender file.
+33 479965675
How many rivals you actually face
across French public contracts, the median is 3 bids per lot; 55% of lots get three or fewer, and only 8% get more than ten.
67% of bids come from SMEs, and in 20% of lots no SME bid at all.
Stakes: Observed value: €639,681 (trade median, 175 contracts), 3 expected bids (trade median, 120 contracts); about €213,227 expected, an order of magnitude, not a quote.
Measured on 4443 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-98677.