Etude technico-économique pour un scénario d'interconnexion en eau potable de la commune de Sommevoire ou un scénario de recherche d'une nouvelle ressource-.
Communauté d'agglomération Grand Saint-Dizier Der et Vallées
Haute-Marne
23 Nov 2026
12 Oct 2026
To win this one
- The stakes: Observed value: €600,000 (trade median, 219 contracts), 3 expected bids (trade median, 147 contracts); about €200,000 expected, an order of magnitude, not a quote.
- The clock: 6 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- VonRoll hydro France, Ax'eau won « Prestations de recherche de fuites sur les réseaux d'eau potable gérés en concession par BRLE Exploitation » with BRL EXPLOITATION (Aude) : 04/10/2026
- VONROLL HYDRO FRANCE SAS won « recherche, localisation et caractérisation de fuites sur le réseau d'eau potable » with Régie de l'Eau Bordeaux Métropole (Gironde) : €1,800,000, 4 bids, 25/09/2026
- SETEC HYDRATEC won « Etude d'élaboration d'un Schéma départemental d'alimentation en eau potable (SDAEP) d'Indre-et-Loire » with Conseil départemental d'Indre et Loire (Indre-et-Loire) : €205,338, sole bidder, 16/09/2026
- GPT GUINTOLI/EHTP, TERIDEAL - SEGEX ENERGIES won « TRAVAUX D'ADDUCTION D'EAU POTABLE, TRAVAUX D'ENTRETIEN DES RESEAUX D'ARROSAGE ET SERVICES DE RECHERCHE DE FUIT » with VILLE DE SAINTE-MAXIME (Var) : €90,748, 4 bids, 27/09/2026
- SETHA, CISE TP NORD OUEST won « Travaux sur les réseaux d'eau potable de la CU GPSEO » with CU Grand Paris Seine & Oise (Yvelines) : €3,500,000, 5 bids, 16/09/2026
Across these 5 contracts: median amount €1,002,669 (4 published) ; median of 4 bids (4 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 23 November 2026, in 6 days.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
on "Etude" contracts, the median is 4 bids per lot; 34% of lots get three or fewer, and only 18% get more than ten.
89% of the bids come from SMEs.
Stakes: Observed value: €600,000 (trade median, 219 contracts), 3 expected bids (trade median, 147 contracts); about €200,000 expected, an order of magnitude, not a quote.
Measured on 67 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-98701.