Travaux de construction du pont-route de la RD930
Société du Canal Seine-Nord Europe
Oise
18 Nov 2026
14 Oct 2026
To win this one
- The stakes: Observed value: €765,637 (trade median, 145 contracts), 3 expected bids (trade median, 80 contracts); about €255,212 expected, an order of magnitude, not a quote.
- The clock: 1 day: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- GT2i GIE, RIBAL TRAVAUX PUBLICS won « Travaux de renforcement de la rd 12 route de TONNEGRANDE - Lots 2 et 3 » with COLLECTIVITE TERRITORIALE DE GUYANE (Guyane) : €217,500, 3 bids, 12/09/2026
- FREYSSINET FRANCE, AXIMUM won « Travaux de réparation du pont Victor Hugo - ECHPON0310 » with GRENOBLE ALPES METROPOLE (Isère) : €5,312,428, 2 bids, 16/10/2026
- COLAS FRANCE won « Divers travaux de terrassement, chaussées, assainissement sur les routes départementales de l'Agence Routière » with Conseil Départemental de la Somme (Somme) : €9,000,000, 2 bids, 15/10/2026
- AER won « Travaux de dispositifs de retenues métalliques ou en béton sur les routes départementales de la Loire » with Département de la Loire (Loire) : €1,348,343, 4 bids, 01/10/2026
- SARL ENTREPRISE FERRIER TP LOT 1, SARL ENTREPRISE FERRIER TP LOT 2 won « 26N0150-VIABILITE HIVERNALE DES ROUTES METROPOLITAINES DE LA DIRECTION TERRITORIALE DE LA TINEE ET DE LA VESUB » with METROPOLE NICE COTE D'AZUR (Alpes-Maritimes) : €59,680, 06/11/2026
Across these 5 contracts: median amount €1,348,343 (5 published) ; median of 2.5 bids (4 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 18 November 2026, tomorrow.
- A single lot: the contract is taken whole or not at all.
- Duration: 30 months.
- Performance starts on 1 June 2027.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
marches@scsne.fr 0344407496
How many rivals you actually face
across French public contracts, the median is 3 bids per lot; 56% of lots get three or fewer, and only 9% get more than ten.
67% of bids come from SMEs, and in 20% of lots no SME bid at all.
With this buyer: This buyer received a median of 3.5 bid(s) on its latest contracts, all trades (2 contracts where the number is published). At the latest contract the holder changed: this buyer does not renew by default. Awarded amounts: median €3,765,795 (2 contracts, from €3,254,715 to €4,276,874).
Stakes: Observed value: €765,637 (trade median, 145 contracts), 3 expected bids (trade median, 80 contracts); about €255,212 expected, an order of magnitude, not a quote.
Measured on 4353 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-98882.